2022 S1 Week 7 Update
Search
Try Notion
2022 S1 Week 7 Update
Date
April 16, 2022
Tags
Updates
Keyword
Empty
Weekly Meeting
Time & Date: 18:00 - 19:00, 12 April 2022
Location: Zoom
FYP Updates
Data Logger Firmware
Made README.md instruction for firmware and Simulink API
Awaiting to transfer the source code from GitHub to BitBucket
Boosted FTP transfer speed by 50% by altering FTP source code
Made trigger based logging with adjustable pre/post-trigger +-6.4s@20ksps
~1s Saving time for 4MiB of data
Over the air firmware update
Able to start logging by using FTP command
Future: automate things using scripts
BiSS Interface Board rev22.1
Estimated Delivery Date
April, 21 2022 - By End of Day
Data Logger Board
Shipped 3x to Uni. Estimated Delivery Date:
April, 19 2022 - By End of Day
Additional Items Required
microSD card
2Row Pin header
USB C Cable
InfluxDB & Grafana
InfluxDB is able to store the logged data.
Grafana is unable to display the data due to JavaScript limitation
Minimum tick is 1ms (Would miss 20-1 data points per tick)
Hosting and maintaining InfluxDB would require another person to do it
The person would need to create a software to interface with InfluxDB to plot the data
Another FYP project to create a centralise log storage
FYP
FYP is under Faculty of Engineering
Could use PEARL and MMS as the report header
The goal/background of the project
For the MMS inverter
For the Quad GAN inverter
For position feedback and data logging