General Update
Klink not convince with skew,
Previous testing wasn't probed on a scope
Will redo testing on a scope
Peter ask me to try SPI block again, could use master transfer to move the buffer data
FPGA is alive
Jig Update
BiSS Jig was manufacture
Still deem unsafe for high speed testing
A shroud will be manufacture
The bottom base will be secure onto a surface (Wooden block)
Timeline
Extended Plan A troubleshoot time
Everything else still on track








